Gordon Primary School

New Design & Build School, Ilford.

Gordon Primary School, formerly Gordon Infant’s School doubled in capacity to become a full through-school from infants to primary.

Key Outcomes:

A Well Engineered building, fit for purpose, blending in with the existing school building

Our Approach

The new 1000sqm two storey teaching block is a modular construction, and was delivered to site and assembled in four days.

The rest of the school was extensively remodelled and extended, during the normal running of the school.

Our Process

Cayford Design supported the design-build contractor Cosmur Construction in this process, assembling and managing the full professional team, producing construction drawings & specifications and obtaining detailed planning and building regulation approvals.

The Results

A rapid increase in capacity, with minimal disruption to the existing operation of the school.

  • Customer LB Redbridge
  • Field Education
  • Location Ilford
  • Year 2018
gordon-B---double-image-template-870px-x-650px
gordon-C---double-image-template-870px-x-650px
Sustainability: BREEAM Excellent London Borough Redbridge Gordon Primary School LB Redbridge HR v3

Modular MMC and schools?

Enquire today